Header
Carnation Construction
Contact Dave
Carnation
S-07-00 Page loading indicator

Home Site Map - Steps -

Bedroom Walls and Ceiling

 

At the end of this phase there will be a fairly waterproof bedroom floor.  There will be holes in the ceiling (ie attic floor) where the stairs and elevator will eventually go up but a tarp can be put over the holes.  The bedroom level windows will have been fitted.  There will not be any stairs between the bedroom floor and the attic floor so it will be necessary to use a ladder.  Included in this phase is doing the gable walls for the roof as we want them to be fully set before doing the roof framing.

 

 

*